JT-60
Japan Torus-60 | |
---|---|
Device type | Tokamak |
Location | Naka, Ibaraki Prefecture, Japan |
Affiliation | Japan Atomic Energy Agency |
Technical specifications | |
Major radius | 3.4 m (11 ft) |
Minor radius | 1.0 m (3 ft 3 in) |
Plasma volume | 90 m3 |
Magnetic field | 4 T (40,000 G) (toroidal) |
Discharge duration | 65 s |
History | |
Year(s) of operation | 1985–2010 |
Preceded by | JFT-2M |
Succeeded by | JT-60SA |
Related devices | TFTR |
Links | |
Website | www |
Japan Torus-60 Super Advanced | |
---|---|
Device type | Tokamak |
Location | Naka, Ibaraki Prefecture, Japan |
Affiliation | QST + F4E |
Technical specifications | |
Discharge duration | 100 s |
History | |
Date(s) of construction | 2013 - 2020 |
Year(s) of operation | 2023–present |
Preceded by | JT-60U |
Related devices | ITER |
Links | |
Website | www |
JT-60 (short for Japan Torus-60) is a large research tokamak, the flagship of the Japanese National Institute for Quantum Science and Technology's fusion energy directorate. As of 2023 the device is known as JT-60SA and is the largest operational superconducting tokamak in the world,[1] built and operated jointly by the European Union and Japan in Naka, Ibaraki Prefecture.[2][3] SA stands for super advanced tokamak, including a D-shaped plasma cross-section, superconducting coils, and active feedback control.
As of 2018,[update] JT-60 holds the record for the highest value of the fusion triple product achieved: 1.77×1028 K·s·m−3 = 1.53×1021 keV·s·m−3.[4][5] To date, JT-60 has the world record for the hottest ion temperature ever achieved (522 million °C); this record defeated the TFTR machine at Princeton in 1996.[6]
Original design
[edit]JT-60 was first designed in the 1970's during a period of increased interest in nuclear fusion from major world powers. In particular, the US, UK and Japan were motivated by the excellent performance of the Soviet T-3 in 1968 to further advance the field. The Japanese Atomic Energy Research Institute (JAERI), previously dedicated to fission research since 1956, allocated efforts to fusion.
JT-60 began operations on April 8, 1985,[7] and demonstrated performance far below predictions, much like the TFTR and JET that had begun operations shortly prior.
Over the next two decades, JET and JT-60 led the effort to regain the performance originally expected of these machines. JT-60 underwent a major modification during this time, JT-60U (for "upgrade") in March 1991.[8] The change resulted in significant improvements in plasma performance.
JT-60U (Upgrade)
[edit]The main objective of the JT-60U upgrade was to "investigate energy confinement near the breakeven condition, [a] non-inductive current drive and burning plasma physics with deuterium plasmas." To accomplish this, the poloidal field coils and the vacuum vessel were replaced. Construction began in November 1989 and was completed in March 1991.[9] Operations began in July.[10]
On October 31, 1996, JT-60U successfully achieved extrapolated breakeven with a factor of QDTeq = 1.05 at 2.8 MA. In other words, if the homogenous deuterium fuel was theoretically replaced with a 1:1 mix of deuterium and tritium, the fusion reaction would have created an energy output 1.05 times the energy used to start the reaction. JT-60U was not equipped to utilize tritium, as it would add extensive costs and safety risks.
In February 1997, a modification to the divertor from an open-type shape to a semi-closed W-shape for greater particle and impurity control was started and later completed in May.[11][12][13] Experiments simulating the helium exhaust in ITER were promptly performed with the modified divertor, with great success. In 1998, the modification allowed JT-60U to reach an extrapolated fusion energy gain factor of QDTeq = 1.25 at 2.6 MA.[14][15][16]
In December 1998, a modification to the vacuum pumping system that began in 1994 was completed. In particular, twelve turbomolecular pumps with oil bearings and four oil sealed rotary vacuum pumps were replaced with magnetically suspended turbomolecular pumps and dry vacuum pumps. The modification reduced the 15-year-old system's consumption of liquid nitrogen by two thirds.[17]
In fiscal year 2003, the plasma discharge duration of JT-60U was successfully extended from 15 s to 65 s.[18]
In 2005, ferritic steel (ferromagnet) tiles were installed in the vacuum vessel to correct the magnetic field structure and hence reduce the loss of fast ions.[19][20] The JAEA used new parts in the JT-60, having improved its capability to hold the plasma in its powerful toroidal magnetic field.
Sometime in 2007-2008, in order to control plasma pressure at the pedestal region and to evaluate the effect of fuel on the self-organization structure of plasma, a supersonic molecular beam injection (SMBI) system was installed in JT-60U. The system's design was a collaboration between Cadarache, CEA, and JAEA.[21]
JT-60U ended operations on August 29, 2008.[22]
JT-60SA
[edit]JT-60SA is the successor to JT-60U, operating as a satellite to ITER as described by the Broader Approach Agreement. It is a fully superconducting tokamak with flexible components that can be adjusted to find optimized plasma configurations and address key physics issues.[23] Assembly began in January 2013 and was completed in March 2020. After a major short circuit during integrated commissioning in March 2021 necessitating lengthy repairs, it was declared active on December 1, 2023. The overall cost of its construction is estimated to be around €560000000, adjusted for inflation.[24]
Weighing roughly 2,600 short tons (2,400 t),[25] JT-60SA's superconducting magnet system includes 18 D-shaped niobium-titanium toroidal field coils, a niobium-tin central solenoid, and 12 equilibrium field coils.
History
[edit]The idea of an advanced tokamak, a tokamak utilizing superconducting coils, traces back to the early 1960's. The idea seemed very promising, but was not without its problems. Around January 1972, engineers at JAERI initiated an effort to further research the idea and try to solve its hurdles.[26] This initiative progressed in parallel with the development of JT-60,[27] and by 1983-84 it was decided that it constituted its own experimental reactor: FER (Fusion Experimental Reactor).[28]
However, the JT-60U upgrade in 1991 demonstrated the significant flexibility of the JT-60 facilities and assembly site, so by January 1993 FER was designated as a modification to JT-60U and renamed JT-60SU (for Super Upgrade).[29]
In January 1996, a paper detailing the superconducting properties of Nb3Al composite wire and its fabrication process was published in the 16th International Cryogenic Engineering/Materials Conference journal.[30] Engineers assessed the potential use of the aluminide in JT-60SU's 18 toroidal coils.[31]
Designs and intentions for the modification varied over the next decade, until February 2007, when the Broader Approach Agreement was signed between Japan and the European Atomic Energy Community.[32] In it, the Satellite Tokamak Program established a clear, defined goal for JT-60SA: act as a small-scale ITER. This way, JT-60SA could give hindsight to engineers assembling and operating the full-scale reactor in the future.
It was planned for JT-60 to be disassembled and then upgraded to JT-60SA by adding niobium-titanium superconducting coils by 2010.[4][33] It was intended for the JT60SA to be able to run with the same shape plasma as ITER.[33]: 3.1.3 The central solenoid was designed to use niobium-tin (because of the higher (9 T) field).[33]: 3.3.1
Assembly
[edit]Construction of the tokamak officially began on 28 January 2013 with the assembly of the cryostat base, which was shipped from Avilés, Spain over a 75-day long journey.[a] The event was highly publicized through local and national news, and reporters from 10 media organizations were able to witness it in person.[34]
Assembly of the vacuum vessel began in May 2014. The vacuum vessel was manufactured as ten sectors with varying arcs (20°x1, 30°x2, 40°x7) that had to be installed sequentially. On June 4, 2014 two of ten sectors were installed. In November 2014 seven sectors had been installed. In January 2015 nine sectors had been installed.
Construction was to continue until 2020 with first plasma planned in September 2020.[35] Assembly was completed on March 30, 2020,[36] and in March 2021 it reached its full design toroidal field successfully, with a current of 25.7kA.[37]
Short circuit
[edit]This section needs additional citations for verification. (February 2024) |
On March 9, 2021, a coil energization test was being performed on equilibrium field coil no. 1 (EF1) when the coil current rapidly increased, then suddenly flatlined. The reactor was safely shut down over the next few minutes, during which the pressure in the cryostat increased from 10×10−3 Pa to 7000 Pa. Investigations immediately followed.
The incident, which came to be known as the "EF1 feeder incident", was found to be caused by a major short circuit resulting from insufficient insulation of the quench detection wire conductor exit. The formed arc damaged the shells of EF1, causing a helium leak to the cryostat.
In total, 90 locations required repairs and machine sensors needed to be rewired. However, the intricate JT-60SA was designed and assembled with intense precision, meaning access to the machine was sometimes limited. Risks of further delay to plasma operations compounded the issue.[38]
The JT-60SA team was disappointed with the incident, given how close the machine was to operation, but persevered.
Repairs were completed in May 2023 and preparations for operation began.[39]
Present operations
[edit]JT-60SA achieved first plasma on October 23, 2023, making it the largest operational superconducting tokamak in the world as of 2024.[1] The reactor was declared active on December 1, 2023.[40]
Specifications
[edit](60 stands for JT-60, 60U stands for JT-60U, 60SA stands for JT-60SA) ("60SA I" refers to the initial/integrated research phase of JT-60SA, "60SA II" refers to the extended research phase)
Volume | Current | Major radius | Minor radius | Aspect ratio | Height | Pulse length | Elongation | Triangularity | |
---|---|---|---|---|---|---|---|---|---|
60 | 2.1 MA - 2.6 MA | 3 m | 0.85 m - 0.95 m | 3.52 - 3.15 | 5 s | ||||
60U | 90 m3 | 3 MA | 3.4 m | 1 m | 3.4 | 1.5±0.3 m | 65 s | 1.5±0.3 | |
60SA I | 5.5 MA | 2.97 m | 1.17 m | 2.54 | 2.14 m | 100 s | 1.83 | 0.50 | |
60SA II | 5.5 MA | 2.97 m | 1.18 m | 2.52 | 2.28 m | 100 s | 1.93 | 0.57 |
Material | Baking temp. | One-turn resistance | |
---|---|---|---|
60 | Inconel 625 | 500 °C | > 1.3 mΩ |
60U | Inconel 625 | 300 °C | 0.2 mΩ |
60SA | SS 316L | 200 °C | 16 µΩ |
# | Turns | Material | Coil current | Inductance | Resistance | Time constant | |
---|---|---|---|---|---|---|---|
60 | 18 | 1296 | 52.1 kA | 2.1 H | 84 mΩ | 25 s | |
60U | 18 | 1296 | AgOFCu | 52.1 kA | 2.1 H | 97 mΩ | 21.65 s |
60SA |
Notes
[edit]- ^ The ship IYO (IMO number: 9300879) routed through the Panama Canal
References
[edit]- ^ a b "First plasma 23 October". JT-60SA. 24 October 2023. Archived from the original on 27 October 2023. Retrieved 15 November 2023.
- ^ "What is JT-60SA?". JT-60SA. Archived from the original on 15 November 2023. Retrieved 15 November 2023.
- ^ "Naka Fusion Institute". www.naka.jaea.go.jp. Archived from the original on 1 July 2007. Retrieved 14 January 2022.
- ^ a b "JT-60 HOME PAGE". Japan Atomic Energy Agency. Archived from the original on 25 April 2021. Retrieved 25 April 2021.
- ^ JT-60 Operational History and the Progress of Plasma Performance Archived 2016-02-23 at the Wayback Machine
- ^ "Plasma physics found in JT-60 tokamak over the last 20 years". Archived from the original on 2021-01-21. Retrieved 2020-12-19.
- ^ 核融合研究センター (1986). Annual Report of the Fusion Research Center for the Period of April 1,1984 to March 31,1985 (Report) (in Japanese). 日本原子力研究開発機構. doi:10.11484/jaeri-m-85-205.
- ^ Naka Fusion Institute (June 2008). FUSION - Future Energy of the Earth (PDF). Japan Atomic Energy Agency. p. 12. Archived (PDF) from the original on 17 August 2022. Retrieved 25 January 2024.
- ^ 那珂研究所 (1991). Annual report of the Naka Fusion Research Establishment for the period of April 1, 1990 to March 31, 1991 (Report) (in Japanese). 日本原子力研究開発機構. doi:10.11484/jaeri-m-91-159.
- ^ 那珂研究所 (1992). Annual report of Naka Fusion Research Establishment for the period of April 1, 1991 to March 31, 1992 (Report) (in Japanese). 日本原子力研究開発機構. doi:10.11484/jaeri-m-92-159.
- ^ Naka-machi; Naka-gun; Ibaraki-ken (1997). Annual Report from April 1, 1996 to March 31, 1997 (PDF) (Report). Naka Fusion Research Establishment. p. 1. Archived (PDF) from the original on January 16, 2024. Retrieved 26 January 2024.
The construction for the divertor modification from the original open type to the W-shaped semi-closed type for improving the particle control was started on February 1997.
- ^ Naka-machi; Naka-gun; Ibaraki-ken (1 October 1998). Annual Report of Naka Fusion Research Establishment from April 1, 1997 to March 31, 1998 (PDF) (Report). p. 1. Archived (PDF) from the original on 16 January 2024. Retrieved 26 January 2024.
The construction for the divertor modification from the original open type to the W-shaped semi-closed type for improving the particle control was finished in May 1997.
- ^ Olgierd Dumbrajs; Jukka Heikkinen; Seppo Karttunen; T. Kiviniemi; Taina Kurki-Suonio; M. Mantsinen; Timo Pättikangas; K.M. Rantamäki; Ralf Salomaa; Seppo Sipilä (1997). Local current profile modification in tokamak reactors in various radiofrequency ranges. Publication / Division of Scientific and Technical Information, International Atomic Energy Agency. Vienna: International Atomic Energy Agency IAEA. ISBN 978-92-0-103997-2. Archived from the original on 2023-10-22. Retrieved 2024-02-25.
- ^ "JT-60U Reaches 1.25 of Equivalent Fusion Power Gain". 7 August 1998. Archived from the original on 6 January 2013. Retrieved 5 December 2016.
- ^ Clery, Daniel (2014-07-29). A Piece of the Sun: The Quest for Fusion Energy. Overlook Press. ISBN 978-1-4683-1041-2. Archived from the original on 2024-02-25. Retrieved 2024-02-02.
- ^ "HIGH PERFORMANCE EXPERIMENTS IN JT-60U REVERSED SHEAR DISCHARGES" (PDF). Archived (PDF) from the original on 2017-03-09. Retrieved 2017-04-30.
- ^ Annual Report of Naka Fusion Research Establishment from April 1, 1998 to March 31, 1999 (PDF) (Report). Archived (PDF) from the original on January 30, 2024. Retrieved January 30, 2024.
- ^ Annual Report of Naka Fusion Research Establishment from April 1, 2003 to March 31, 2004 (PDF) (Report). Archived (PDF) from the original on January 30, 2024. Retrieved January 30, 2024.
- ^ "Achievement of long sustainment of a high-confinement, high-pressure plasma in JT-60 - A big step towards extended burn in ITER with the use of ferritic steel -" (Press release). Japan Atomic Energy Agency. 9 May 2006. Archived from the original on 16 June 2019. Retrieved 5 December 2016.
- ^ "ferromagnet diagrams". Archived from the original on 2017-01-24. Retrieved 2016-02-16.
- ^ Annual Report of Fusion Research and Development Directorate of JAEA from April 1, 2007 to March 31, 2008 (PDF) (Report). 20 October 1998. p. 18. Archived (PDF) from the original on 30 January 2024. Retrieved 30 January 2024.
- ^ 核融合研究開発部門 (2011). Annual report of Fusion Research and Development Directorate of JAEA for FY2008 and FY2009 (Report) (in Japanese). 日本原子力研究開発機構. doi:10.11484/jaea-review-2011-009.
- ^ "Broader Approach agreement". ITER. Archived from the original on 2024-02-07. Retrieved 2024-02-29.
- ^ "JT-60SA is officially the most powerful Tokamak". December 2023. Archived from the original on 2024-02-21. Retrieved 2024-02-21.
- ^ JT-60SA - Toward the Realization of Fusion Energy (PDF). January 2021. p. 3. Archived (PDF) from the original on 14 August 2022. Retrieved 26 January 2024.
- ^ "Superconducting Coils for a Fusion Reactor". Archived from the original on 2024-02-22. Retrieved 2024-02-22.
- ^ 核融合研究部 (1979), 核融合研究部および大型トカマク開発部 年報; 昭和52年度, 日本原子力研究開発機構, doi:10.11484/jaeri-m-8059
- ^ 臨界プラズマ研究部 (1986). 核融合実験炉(FER)概念設計; 昭和59年度、60年度 [Nuclear Fusion Experimental Reactor (FER) Conceptual design; Showa 59, 60] (Report) (in Japanese). 日本原子力研究開発機構. doi:10.11484/jaeri-m-86-134.
- ^ Institute of Electrical and Electronics Engineers; IEEE Nuclear and Plasma Sciences Society, eds. (1993). 15th IEEE/NPSS Symposium on Fusion Engineering: October 11 - 15, 1993, Hyannis, Massachusetts. Piscataway, NJ: IEEE Service Center. ISBN 978-0-7803-1412-2.
- ^ Haruyama, T.; Mitsui, Takeo; Yamafuji, Kaoru (1997). Proceedings of the Sixteenth International Cryogenic Engineering Conference/ International Cryogenic Materials Conference: Kitakyushu, Japan, 20-24 May 1996. International Cryogenic Engineering Conference, International Cryogenic Materials Conference. Oxford: Elsevier. ISBN 978-0-08-042688-4.
- ^ 青柳, 哲雄 (1997). 定常炉心試験装置の設計研究,第5編; 電源設備 [Design and research of constant furnace core test device, Part 5; Power supply equipment] (Report) (in Japanese). 日本原子力研究開発機構. doi:10.11484/jaeri-research-97-010.
- ^ European Commission. Directorate General for Energy. (2020). Broader approach :cutting edge fusion energy research activities. LU: Publications Office. doi:10.2833/62030. ISBN 978-92-76-16659-7. Archived from the original on 2024-02-25. Retrieved 2024-02-05.
- ^ a b c "JAEA 2006-2007 annual report". Archived from the original on 2013-01-06. Retrieved 2016-02-16.
3.1.3 Machine Parameters : A bird's eye view of JT-60SA is shown in Fig. I.3.1-1. Typical parameters of JT-60SA are shown in Table I.3.1-1. The maximum plasma current is 5.5 MA with a relatively low aspect ratio plasma (Rp=3.06 m, A=2.65, κ95=1.76, δ95=0.45) and 3.5 MA for an ITER-shaped plasma (Rp=3.15 m, A=3.1, κ95=1.69, δ95=0.36). Inductive operation with 100s flat top duration will be possible within the total available flux swing of 40 Wb. The heating and current drive system will provide 34 MW of neutral beam injection and 7 MW of ECRF. The divertor target is designed to be water-cooled in order to handle heat fluxes up to15 MW/m2 for long time durations. An annual neutron budget of 4x1021 neutrons is foreseen
lots of detail on JT-60SA in section 3 - ^ martial (2013-04-05). "JT-60SA: The Tokamak assembly begins". Fusion for Energy. Archived from the original on 2024-02-19. Retrieved 2024-03-06.
- ^ "The JT-60SA project Introduction". Japan Atomic Energy Agency. Archived from the original on 5 March 2016. Retrieved 6 March 2018.
- ^ "JT-60SA: World's largest superconducting tokamak completed!". Newsletter 113. National Institutes for Quantum and Radiological Science and Technology. April 2020. Archived from the original on 2020-06-22. Retrieved 2020-06-21.
- ^ "02.03.2021 – JT-60SA successfully reaches its full design toroidal field – JT-60SA". Archived from the original on 2021-03-02. Retrieved 2021-03-19.
- ^ "Team spirit, resilience, and adaptability key to JT-60SA repairs". Fusion for Energy. 28 November 2022. Archived from the original on 2 December 2023. Retrieved 7 February 2024.
- ^ "Operations restart with vacuum pumping on 30.05.2023". JT-60SA. 5 June 2023. Archived from the original on 15 November 2023. Retrieved 15 November 2023.
- ^ "EU and Japan celebrate start of operations of the JT-60SA fusion reactor and reaffirm close cooperation on fusion energy - European Commission". energy.ec.europa.eu. Archived from the original on 2023-12-13. Retrieved 2024-02-29.
- ^ Hosogane, N.; Ninomiya, H.; Matsukawa, M.; Ando, T.; Neyatani, Y.; Horiike, H.; Sakurai, S.; Masaki, K.; Yamamoto, M.; Kodama, K.; Sasajima, T.; Terakado, T.; Ohmori, S.; Ohmori, Y.; Okano, J. (November 2002). "Development and Operational Experiences of the JT-60U Tokamak and Power Supplies". Fusion Science and Technology. 42 (2–3): 368–385. Bibcode:2002FuST...42..368H. doi:10.13182/FST02-A234. ISSN 1536-1055. S2CID 120683442. Archived from the original on 2024-02-25. Retrieved 2024-02-25.
- ^ a b c 核融合研究部 (1978). Annual Report of Division of Thermonuclear Fusion Research and Division of Large Tokamak Development for the Period of April 1, 1976 to March 31, 1977 (Report) (in Japanese). 日本原子力研究開発機構. doi:10.11484/jaeri-m-7479.
- ^ 核融合研究開発部門 (2011). "Annual report of Fusion Research and Development Directorate of JAEA for FY2008 and FY2009" (in Japanese). 日本原子力研究開発機構. doi:10.11484/jaea-review-2011-009.
{{cite journal}}
: Cite journal requires|journal=
(help) - ^ Ishida, S.; Barabaschi, P.; Kamada, Y. (2011-09-01). "Overview of the JT-60SA project". Nuclear Fusion. 51 (9): 094018. Bibcode:2011NucFu..51i4018I. doi:10.1088/0029-5515/51/9/094018. ISSN 0029-5515. S2CID 122120186.
External links
[edit]- Official website of JT-60SA (JT-60/JT-60U)
- Official website of QST
- Official website of JAEA (JAERI)
- JAEA Originated Papers Searching System
- Official website of Fusion for Energy